This project involves the acquisition of all properties along Neadham Rd, removal of residential structures and all utilities and road infrastructure associated with Neadham Road. Once property acquisition is complete the remaining levee infrastructure will be removed, and the river will be allowed to access its historic floodplain. The project is intended to reconnect the historic floodplain disconnected by the Neadham Road flood control structures on the right bank between RM 26.7 and RM 25.6. This project is currently in final acquisition and preliminary design phase.